Tidewater Footbridge

A cable-stayed pedestrian bridge lifted into place in a single weekend river closure.

Tidewater Footbridge

Client

Hull City Council

Location

Hull

Contract value

£9m

Size

142 m span

Programme

13 months

Completed

2023

Case study

Case study

The brief

A cable-stayed pedestrian bridge lifted into place in a single weekend river closure. Hull City Council needed a fixed completion date and a contractor willing to hold it.

How we built it

We modelled the full 13 months programme before breaking ground and agreed every long-lead package in the first eight weeks. Structure and envelope ran in overlapping zones so the building was watertight well before fit-out began.

The result

Handed over in 2023 on the agreed date and within the £9m contract sum, with no lost-time incidents on site and a defects list closed inside four weeks.