The Foundry Museum

A former ironworks rebuilt as a museum, with an exposed concrete stair cast in one continuous pour.

The Foundry Museum

Client

Foundry Trust

Location

Birmingham

Contract value

£33m

Size

9,600 m²

Programme

28 months

Completed

2025

Case study

Case study

The brief

A former ironworks rebuilt as a museum, with an exposed concrete stair cast in one continuous pour. Foundry Trust needed a fixed completion date and a contractor willing to hold it.

How we built it

We modelled the full 28 months programme before breaking ground and agreed every long-lead package in the first eight weeks. Structure and envelope ran in overlapping zones so the building was watertight well before fit-out began.

The result

Handed over in 2025 on the agreed date and within the £33m contract sum, with no lost-time incidents on site and a defects list closed inside four weeks.