Linden Row Apartments

Two residential blocks over a shared podium, with every balcony cast in place and every home handed over snag-free.

Linden Row Apartments

Client

Linden Living

Location

Manchester

Contract value

£38m

Size

186 homes

Programme

24 months

Completed

2025

Case study

Case study

The brief

Two residential blocks over a shared podium, with every balcony cast in place and every home handed over snag-free. Linden Living needed a fixed completion date and a contractor willing to hold it.

How we built it

We modelled the full 24 months programme before breaking ground and agreed every long-lead package in the first eight weeks. Structure and envelope ran in overlapping zones so the building was watertight well before fit-out began.

The result

Handed over in 2025 on the agreed date and within the £38m contract sum, with no lost-time incidents on site and a defects list closed inside four weeks.