Residential
Linden Row Apartments
Two residential blocks over a shared podium, with every balcony cast in place and every home handed over snag-free.

Client
Linden Living
Location
Manchester
Contract value
£38m
Size
186 homes
Programme
24 months
Completed
2025
The brief
Two residential blocks over a shared podium, with every balcony cast in place and every home handed over snag-free. Linden Living needed a fixed completion date and a contractor willing to hold it.
How we built it
We modelled the full 24 months programme before breaking ground and agreed every long-lead package in the first eight weeks. Structure and envelope ran in overlapping zones so the building was watertight well before fit-out began.
The result
Handed over in 2025 on the agreed date and within the £38m contract sum, with no lost-time incidents on site and a defects list closed inside four weeks.